The PDI is the walkthrough before you take possession of a newly built home. What goes on the form at that appointment shapes what gets fixed afterwards, so it is worth arriving prepared rather than excited.
What the Appointment Is For
Before you take possession of a newly built home in Ontario, you and a representative of the builder walk through it together. This is the pre-delivery inspection, usually shortened to PDI, and it is a required step rather than a courtesy.
Its purpose is documentation. You are there to record the condition of the home at the moment it is handed over: what is complete, what is incomplete, what is damaged, and what is missing. That record becomes the reference point for warranty work afterwards, which is why the appointment deserves more preparation than most buyers give it.
It is worth separating two things that often get confused. Our article on Tarion warranty protection explains what the warranty covers once you own the home. This article is about the appointment itself, where the starting condition gets written down.
Arrive in the Right Frame of Mind
The honest difficulty with a PDI is emotional rather than technical. You are standing in a house you have waited a long time for, possibly years, and the instinct is to admire it. The job in front of you is the opposite: to look for what is wrong.
A few practical things help. Allow more time than you are offered, and say so in advance. Bring someone with you, because two people notice more than one and one of you can write while the other looks. Bring a phone with a charged battery for photographs, a torch for dark corners, and something small to plug in so you can test outlets.
And do not rush the paperwork at the end because you are keen to get the keys. Anything you sign off as acceptable is harder to raise later.
Working Through the Home
A room-by-room approach is more reliable than wandering. In each room, look at the same categories in the same order so you are less likely to skip one.
Surfaces and finishes
Walls, ceilings, trim and paint. Look along surfaces at a shallow angle rather than straight on, which is how you see ripples, roller marks and filler that has not been sanded. Check flooring for scratches, lifting, gaps at the edges and any section that sounds hollow underfoot.
Things that open and close
Every door, every window, every cupboard and every drawer. Open them fully and close them fully. Doors that catch on the frame, windows that do not seal, cupboards that do not sit square and handles that are loose are all common and all easy to record.
Water
Run every tap, hot and cold. Flush every toilet. Fill and drain sinks and the bath so you can see whether they drain properly and whether anything leaks underneath. Look under every sink with your torch, because that is where you find a connection that was not finished.
Power and air
Test outlets. Try every light switch and work out what it controls. Check that heating and cooling respond at the thermostat, and that vents are present, open and not full of construction dust.
Outside and below
Walk the exterior. Look at grading away from the foundation, at the condition of the driveway and walkway, at exterior finishes and at anything that was supposed to be installed and is not. In the basement and garage, look for cracks, water staining and unfinished work.
What Goes on the Form
Record everything you find, including the small items. A mark on a wall feels too trivial to write down while you are standing there, and it stops feeling trivial when you are trying to have it repaired two months later and it is not on the list.
Be specific. "Scratch on floor" is weaker than "scratch approximately 20 centimetres, hardwood, second bedroom, near window". Photograph each item as you record it, with something in frame for scale where that helps.
If something is incomplete rather than damaged, say so explicitly, because an item that is missing is a different category from an item that is defective.
After the Appointment
Keep your copy of the form and your photographs together, and keep them permanently rather than until the work is done. The record of what was noted at handover is what you will be referring back to if a disagreement arises later about whether something was pre-existing.
Warranty in Ontario operates on defined timelines with defined windows for reporting, so knowing those dates and diarising them is part of the job. Again, that is covered in our warranty article.
If you are still earlier in the process than this, the buying guide sets out the full sequence from signing through to possession.
Have Questions About Pre-Construction?
Matthew Caporiccio can help you understand pricing, deposit structures, and availability at The Valleys of Thornhill and other pre-construction projects across the GTA.
